- Construction of a Bridge linking Matsom and Alachu, at a cost of 23.000.000 FCFA.
- Acquisition of a Grader, at a cost of 100.000.000 FCFA.
- Supply of Medical Equipment to Azire and Ntambag Integrated Health Centres, at a cost of 20.000.000 FCFA.
- Construction of a Block of Two Wards and One Nurse Office at Azire Integrated Health Centre, at a cost of 30.000.000 FCFA.
- Construction of a Culvert at Atua-Azire and Nkura (Njanga Hill), at a cost of 9.181.000 FCFA.
- Construction of a Bridge linking Ntamulung and Cow Street, at a cost of 32.000.000 FCFA.
- Purchase of Equipment of the Literacy component at G.S. Ngomgham, at a cost of 12.000.000 FCFA;
- Rehabilitation of a Block of Two Classrooms in Government Practicing School (GPS) Ntambag, at a cost of 10.000.000 FCFA;
- Rehabilitation of a Block of Two Classrooms at GS Ntambag, at a cost of 10.000.000 FCFA.